A Weld Passed Inspection in 2010. It Ruptured 12 Years Later.

Summary

A pipeline weld in Washington County, Kansas passed its inspection X-ray in November 2010. On December 7, 2022, it ruptured, spilling 12,937 barrels of crude oil into Mill Creek -- one of the largest inland oil spills in recent U.S. history, per the Justice Department. Federal investigators found the flaw was a type standard radiography is known not to reliably catch. PHMSA's own accounting puts the total cost of the spill at $600.8 million. This month, nearly four years later, the pipeline's owner agreed to pay $29.9 million to settle the resulting federal and state Clean Water Act claims.

By Augustus · July 16, 2026

On November 19, 2010, a girth weld on the Keystone Cushing Extension pipeline in Kansas was radiographed and passed inspection, per PHMSA's failure investigation report. Twelve years later, on December 7, 2022, that same weld ruptured, releasing an estimated 12,937 barrels of crude oil -- most of it into Mill Creek in Washington County, Kansas. The Justice Department calls it one of the largest inland oil spills in recent U.S. history, and the largest ever from the Keystone Pipeline system. PHMSA's investigators later found the crack that caused the rupture started at a defect that standard radiography is known to miss when it runs parallel to the pipe wall -- which is exactly how this one ran.

A blind spot the X-ray couldn't see

The failed fitting was fabricated in a Houston shop in 2010, part of a warranty-replacement program that swapped out 70 undersized elbow fittings across the Cushing Extension after a hydrostatic test found their steel didn't meet strength specifications. The replacement weld was radiographed before burial and passed. It sat undisturbed for over a decade until PHMSA's post-rupture metallurgical exam found internal root-pass weld repairs with lack-of-fusion defects -- and confirmed that a second radiograph, taken at the lab after the accident, still didn't catch them. Only ultrasonic phased-array testing, run after the pipe had already failed, found the flaw. PHMSA attributes the bending stress that eventually cracked the weld to inadequate soil compaction during the same 2010 repair: the backfill spoil pile sat exposed to freezing temperatures for several days, and TC could produce no site-specific records showing the backfill had been inspected before burial.

785 workers, five miles of dead clams

Cleanup crews grew nearly sevenfold in six weeks -- from 119 contract personnel four days after the rupture to 785 at the response's late-January peak, per EPA pollution reports cited in PHMSA's investigation. Benzene from the spilled diluted bitumen passed an underflow dam built to contain it and reached the water column downstream; clams were found dead as far as five miles past the dam. Sediment cleanup of Mill Creek itself wrapped in May 2023, but full remediation of the spill site wasn't finished until February 2024, per the Clean Water Act consent decree South Bow signed this month -- roughly 14 months after the creek bed itself was clean.

Total incident cost
$600.8M
PHMSA's own accounting of cleanup, remediation, and response costs for the December 2022 Mill Creek rupture
Federal + Kansas settlement
$29.9M
The $26.87M civil penalty plus the $3.08M Kansas restoration payment South Bow agreed to pay this month -- about 5% of the total incident cost
Years the flaw hid in the weld
12 years
The girth weld passed radiographic inspection on Nov. 19, 2010; it ruptured Dec. 7, 2022 -- PHMSA found the flaw was a defect type radiography is known not to reliably detect
Cleanup crews grew nearly sevenfold in six weeks
Contract personnel assigned to the Mill Creek oil-spill response, December 2022-January 2023
Dec 11, 2022
119
Dec 18, 2022
368
Jan 21, 2023 (peak)
785
Source: PHMSA Failure Investigation Report, TC Oil Pipeline Operations Inc. (Oct. 25, 2024), citing EPA pollution reports (POLREPs)
View data as table
Company-representative headcounts ran alongside these contract-personnel totals throughout: 41 on Dec. 11, 48 on Dec. 18, 53 at the Jan. 21 peak. Mill Creek sediment cleanup itself wasn't finished until May 9, 2023; full site remediation ran until February 2024.
Dec 11, 202211917 vacuum trucks, 1,800 ft of boom
Dec 18, 202236827 vacuum trucks, 7,300 ft of boom
Jan 21, 2023 (peak)78536 vacuum trucks, 72 skimmers, 10,650 ft of boom

$600.8 million to clean up, $29.9 million to settle

PHMSA's own accounting puts the total cost of the incident -- cleanup, remediation, response, and related expenses -- at $600,793,659. On July 10, 2026, the EPA, Justice Department, and State of Kansas announced the settlement of the resulting Clean Water Act case: a $26,867,789 civil penalty to the federal Oil Spill Liability Trust Fund, due within 30 days, plus $3,080,000 South Bow will spend on Kansas-approved natural-resource restoration projects over the next three years -- $29.9 million combined. South Bow separately estimates it will spend about $40 million complying with new prevention and detection requirements the settlement imposes, money spent on future compliance rather than a payment for what already happened. "The oil spill blanketed land and water, rendering the waterway lifeless and useless," 's Jeffrey A. Hall said announcing the deal.

The settlement is a fraction of what the spill actually cost
Total incident cost vs. the money South Bow is paying in the July 2026 Clean Water Act settlement
Total incident cost
600,793,659
Federal civil penalty
26,867,789
Kansas restoration payment
3,080,000
Source: PHMSA Failure Investigation Report (Oct. 2024); EPA-DOJ-Kansas Consent Decree, Civ. No. 2:26-cv-2401 (filed July 10, 2026)
View data as table
South Bow separately estimates it will spend about $40 million complying with new prevention-and-detection requirements the settlement imposes -- money spent on future compliance, not a payment for past harm, so it isn't charted as a penalty here. Combined with the two bars shown, EPA values the full settlement at about $69.9 million.
Total incident cost600,793,659PHMSA's own tally: cleanup, remediation, response, and related costs
Federal civil penalty26,867,789To the Oil Spill Liability Trust Fund, due within 30 days
Kansas restoration payment3,080,000For state-approved natural-resource restoration projects

The takeaway

  • The detection method has a known blind spot. PHMSA's report states plainly that radiographic technology cannot reliably find lack-of-fusion defects oriented parallel to the pipe wall -- which is what let this weld pass inspection twice: once in 2010, and again on a second radiograph taken after it had already failed.
  • The fix now covers the whole system, not just the failed segment. The March 2023 amended corrective-action order extended remedial work to the entire Keystone Mainline and Cushing Extension -- not just the Washington, Kansas segment -- and the 2026 settlement codifies a fixed inspection schedule (annual leak-detection runs, biennial bending-strain assessments, five-year ultrasonic crack re-inspections) as an enforceable, system-wide requirement rather than case-by-case practice.
  • The company admits no fault while paying the penalty. South Bow denies liability under the consent decree's standard language even as it pays -- the settlement resolves the case without an admission of wrongdoing.

The $600.8 million total-incident-cost figure and the 2026 settlement figures are not a single accounting -- PHMSA's tally is the operator's own reporting of cleanup, remediation, and response spending that mostly predates the legal settlement, which covers only the civil penalty, the Kansas restoration payment, and estimated future compliance spending. PHMSA's report gives two similar but distinct barrel counts for the same release: 12,937 barrels estimated released, and 12,973 barrels ultimately recovered, disposed of, or evaporated during cleanup -- both appear in the source and are not a contradiction. South Bow (USA) LP operated under the name TC Oil Pipeline Operations Inc. at the time of the 2022 rupture; its parent was spun off from TC Energy Corp. as an independent company in October 2024.

Sources(4) ▾
  • U.S. DOT Pipeline and Hazardous Materials Safety Administration (PHMSA), Failure Investigation Report -- TC Oil Pipeline Operations Inc.: Rupture -- Circumferential Girth Weld Failure (2024-10-25)PHMSA's own investigation of the December 7, 2022 rupture of the Keystone Cushing Extension pipeline near Washington, Kansas -- the root-cause metallurgical findings, the spill-response mobilization timeline, and the operator's own $600,793,659 total-cost accounting all come from this report. phmsa.dot.gov · original document
  • U.S. District Court for the District of Kansas / U.S. EPA / U.S. DOJ, Consent Decree, United States and State of Kansas ex rel. KDHE v. South Bow (USA) LP and South Bow Infrastructure Operations Inc., Civ. No. 2:26-cv-2401 (D. Kan.) (2026-07-10)The Clean Water Act consent decree resolving the federal and Kansas civil claims arising from the 2022 rupture -- the source for the civil-penalty amount, the Kansas restoration payment, the injunctive-relief inspection requirements, and the corporate-history background on South Bow's 2024 spin-off from TC Energy. epa.gov · original document
  • U.S. Environmental Protection Agency, South Bow L.P. CWA Settlement Summary (2026-07-10)'s own plain-language summary of the settlement, including the $69 million total settlement valuation (penalty plus estimated injunctive-relief spending plus the Kansas payment) and a description of the required prevention-and-detection work. epa.gov · original document
  • U.S. Department of Justice, Office of Public Affairs, Justice Department Files Proposed Settlement with Owner and Operator of Keystone Pipeline to Resolve Clean Water Act Violations for 2022 Pipeline Rupture in Kansas (2026-07-10)'s announcement of the settlement, including the characterization of the spill as one of the largest inland oil spills in recent U.S. history and on-record quotes from and officials. justice.gov · original document