Ramsey County's 911 Grant: $273,011 on a No-Bid Contract
Summary
A Justice Department inspector general audit found Ramsey County, Minnesota spent $273,011 in federal grant money on three emergency-radio-tower generators through a contract it never competitively bid, on a $2.97 million grant meant to replace 911 dispatch radios. The same audit found the county's federal-spending disclosure omitted $636,179 tied to this grant entirely, and that its yearly compliance filing arrived more than six months late.
A radio grant, and a generator contract nobody bid on
The Office of Community Oriented Policing Services⧉ awarded Ramsey County -- Minnesota's second-most populous county, home to Saint Paul and the state's largest 911 dispatch center -- $2,965,000 in September 2024 to replace aging first-responder radios and the generators that keep radio towers running during power outages. Auditors tested every dollar the county drew down. Of the $2,791,569 pulled by January 2026, they verified $2,518,558 spent properly on 398 radios and peripherals. The remaining $273,011 -- the entire cost of the three generators -- went through a sole-source contract with a vendor tied to the Ramsey/Washington Recycling & Energy Board that the county never competitively bid, in violation of its own approved budget. The staff who bought the generators told auditors they relied on incorrect guidance from the Finance Department claiming the contract had been competitively bid; the officials managing the award said it was their first experience with a federal grant.
View data as table
| Radios and peripherals (verified) | 2,518,558 |
|---|---|
| Generators (questioned, no-bid contract) | 273,011 |
| Undrawn balance remaining on the award | 173,431 |
A fourth generator, dropped, and never reported
The grant budget originally covered four generators. Partway through, Ramsey County found other funding to cover one of them, so only three were bought with grant money -- but the county never told the COPS Office⧉ about the swap, as the award's duplicative-funding condition requires. County officials said they simply didn't know the notification process existed, and that they'd like to reallocate the leftover budget toward more radios. Of the 's four recommendations, the COPS Office concurred with all of them; Ramsey County agreed with three but pushed back on this one, arguing the fourth generator became unnecessary through a separate county project rather than duplicative funding -- the 's closing analysis didn't accept the distinction, noting the county's own procurement policy doesn't address funding from multiple sources for the same purpose.
The same grant, missing from the county's own books
Beyond the generators, auditors found Ramsey County's paperwork problems ran deeper than one contract. The grant's $636,179 in FY2024 federal expenditures⧉ was left off the Schedule of Expenditures of Federal Awards inside the county's own FY2024 single audit -- the document meant to give federal agencies and the public a complete count of a government's federal spending for the year. County officials blamed a manual compilation process for missing it. That single audit itself arrived more than six months past its statutory deadline, filed in April 2026; a county official attributed the delay to the prior year's audit also running late, filed in May 2025 after numerous financial-statement errors required correction. That FY2023 audit had already surfaced material weaknesses and significant deficiencies in the county's controls, findings the new report doesn't erase.
View data as table
| Reported on the FY2024 Schedule of Expenditures of Federal Awards | 0 |
|---|---|
| Actual FY2024 federal expenditures under this grant | 636,179 |
Drawdowns nobody was tracking, either
A third gap surfaced in how the county pulled its own grant money. Federal rules require drawdown requests timed to cover only immediate costs, but Ramsey County made just one drawdown request between December 2024 and July 2025⧉ -- a roughly seven-month stretch -- because the official responsible for overseeing drawdowns didn't know a prior request had failed. Auditors found no formal drawdown procedure behind any of it. In 2024 the county had created a Grants & Revenue Office to centralize oversight after years of department-by-department grant management, but a countywide grants manual meant to standardize these processes wasn't expected to launch until late 2026 at the earliest -- the county's written response to the audit put it in "final draft" and targeted for that summer.
The takeaway
- A no-bid contract put the entire cost of the county's own generators in question. The $273,011 in questioned costs is the full amount spent on the three generators -- not a sampled estimate -- because Ramsey County couldn't produce procurement records showing the contract was competitively priced or fairly awarded, as its own approved budget required.
- A $636,179 blind spot in the county's federal-spending count. The same grant's FY2024 spending never appeared on Ramsey County's Schedule of Expenditures of Federal Awards, filed more than six months late after the prior year's audit ran into its own errors -- leaving the public record of the county's federal grants incomplete for the year the generators were bought.
- All four findings resolved, but the county disputes one. The COPS Office concurred with every recommendation, and Ramsey County agreed to three of four -- committing to a grants manual, corrected single-audit procedures, and repayment discussions on the $273,011. It contests only the finding that it failed to report duplicative funding on the dropped fourth generator.
's procurement and physical-verification testing covered 100% of grant expenditures and a judgmental sample of 40 radios across 5 locations plus all 3 generators; the sample was designed for broad exposure to the grant's different facets rather than to support a statistical projection. The Justice Department's grants office, not the , will decide whether Ramsey County must repay the $273,011 or resolve it through other means; as of this report, that determination was still pending.
Sources(3) ▾
- U.S. Department of Justice, Office of the Inspector General, Audit Division, Audit of the Office of Community Oriented Policing Services Technology and Equipment Program Grant Awarded to Ramsey County, Ramsey County, Minnesota (Report 26-068) (2026-07-07) — performance audit testing whether costs Ramsey County claimed under a FY2024 COPS Technology and Equipment Program grant (award 15JCOPS-24-GG-02198-TECP) were supported and allowable. Scope: March 1, 2024 through January 31, 2026; 100 percent of grant expenditures tested, plus a judgmental physical-verification sample of 40 radios across 5 locations and all 3 purchased generators. Fetched directly from oig.justice.gov and converted with pdftotext -layout; read in full, including both agency-response appendices and the 's closing analysis. oig.justice.gov · original document
- U.S. Department of Justice, Office of the Inspector General, Audit of the Office of Community Oriented Policing Services Technology and Equipment Program Grant Awarded to Ramsey County, Ramsey County, Minnesota (report landing page) (2026-07-07) — Official report landing page confirming report number 26-068, posting date, and providing the direct PDF link used as this piece's primary document. oig.justice.gov · original document
- U.S. Department of Justice, Office of Community Oriented Policing Services, Technology and Equipment Program (TEP) (2026-07-16) — COPS Office's own program page describing the Technology and Equipment Program that funded the Ramsey County grant, used to confirm the program's general purpose and structure. cops.usdoj.gov · original document
Comments
Always open. Logged-in readers can annotate paragraphs in place.
A Justice Department Inspector General audit⧉ of a $2,965,000 federal grant funding new 911 dispatch radios and radio-tower generators in Ramsey County, Minnesota found that county officials spent the entire $273,011 cost of three replacement generators through a contract they never put out to competitive bid -- a cost auditors flagged as unallowable, on a grant whose entire purpose was keeping the county's emergency-communications network working.