A GAO review found 28 USDA and EPA programs that can help rural communities without drinking water or wastewater service build or improve their infrastructure. The agencies signed a joint memorandum in 2017 laying out best practices for coordinating that assistance -- but haven't updated or monitored it since. GAO's recommendation to fix that split the two agencies -- EPA agreed, USDA didn't.

By Vindex · July 13, 2026

Rural communities without drinking water or wastewater service have 28 federal programs they could turn to for help, a review found -- spread across and , each with its own deadlines, eligibility rules, and restrictions on how funds can be used. Communities often need to apply to several of these programs at once to fully fund a project, and found the timing rarely lines up: in one case, a community's federal grant arrived too late to secure a matching state grant, putting the whole project at risk.

The scale of what's needed

's own 2022 Clean Watersheds Needs Survey put the unfunded need for centralized wastewater and stormwater infrastructure in rural areas at $57.0 billion -- 12% of the national total -- and the need for wastewater treatment and collection specifically at $37.8 billion, 11% of the total. Those two figures likely overlap rather than add up to $94.8 billion combined; itself cautioned that rural areas' small share of the reported national total may partly reflect low survey response rates from small communities, not the true size of the gap.

Neither nor collects nationwide data on how many rural communities actually lack service in the first place -- 's regulatory reach only covers water systems serving at least 25 people, structurally excluding much of the smallest, least-served population. 's report grounds the abstraction in one place it could measure directly: Greene County, Alabama, where a federal study put wastewater capital costs at $12 million to $33 million, in a county where 40% of residents live in poverty.

Federal programs that can fund rural water projects
28
across USDA and EPA, each with its own deadlines, eligibility rules, and funding restrictions
Unfunded rural wastewater/stormwater need
$57.0B
12% of the nationally reported total, per EPA's 2022 Clean Watersheds Needs Survey
Average cost of a USDA-funded rural water project
$9M
ranging from $270K to $130M across roughly 500 sampled FY2023-2024 projects
Two ways EPA measures what rural areas still need
Estimated unfunded infrastructure need in rural areas, from EPA's 2022 Clean Watersheds Needs Survey
Centralized wastewater & stormwater infrastructure (12% of national total)
57,000,000,000
Wastewater treatment & collection specifically (11% of national total)
37,800,000,000
Source: GAO-26-107355, citing EPA's 2022 Clean Watersheds Needs Survey
View data as table
EPA's 2022 survey categories appear to nest rather than sit side by side: the broader $57.0 billion figure (wastewater plus stormwater) and the narrower $37.8 billion figure (wastewater treatment and collection alone) likely share the same underlying wastewater dollars, with the roughly $19 billion difference plausibly representing the stormwater-specific portion -- GAO's report doesn't state this relationship explicitly, but the category definitions make double-counting a real risk. Do not add these two figures together. EPA also cautioned that rural areas' small reported share of national need may partly reflect low survey response rates from small communities, not a true absence of need.
Centralized wastewater & stormwater infrastructure (12% of national total)57,000,000,000
Wastewater treatment & collection specifically (11% of national total)37,800,000,000

One block of pipe, one regional treatment plant

's review of about 500 -funded rural water and sewer projects from fiscal years 2023 and 2024 found estimated costs ranging from about $270,000 to $130 million, averaging around $9 million. That range illustrates the scale problem underneath the coordination problem: a small community replacing a few blocks of pipe and a multi-town regional treatment authority are navigating the same 28-program landscape.

From one block of pipe to a regional treatment plant
Estimated costs across roughly 500 USDA-funded rural water and sewer projects, FY2023-2024
Smallest sampled project
270,000
Average sampled project
9,000,000
Largest sampled project
130,000,000
Source: GAO-26-107355, analysis of USDA Rural Utilities Service data
View data as table
GAO's review of about 500 USDA-funded rural water and sewer projects (fiscal years 2023-2024) found estimated costs spanning from about $270,000 to $130 million -- a nearly 500-fold range that means the same 28-program landscape has to serve a single block of replacement pipe and a multimillion-dollar regional treatment plant alike.
Smallest sampled project270,000
Average sampled project9,000,000
Largest sampled project130,000,000

A 2017 agreement, never revisited

and signed a joint memorandum in 2017 laying out best practices -- streamlining applications, coordinating among funding partners -- meant to help states and communities navigate exactly this fragmented landscape. found the two agencies haven't collaborated to update or monitor it since. Its recommendation that they do so drew a split response: agreed and said its water-office staff expected to start talks with counterparts by the end of fiscal year 2026. disagreed, citing new April 2026 regulations it said should shift environmental-process guidance to -- a point said doesn't actually limit 's ability to update the shared memorandum.

The takeaway

  • The program count itself is in flux. 's list started larger before 7 programs -- 4 , 3 -- were removed as discontinued by December 2025, leaving 28.
  • The dollar range within one program is enormous. -funded rural water projects ranged from $270,000 to $130 million -- a nearly 500-fold spread.
  • The two agencies didn't agree on the fix. accepted 's recommendation to update their shared coordination memo; did not.

Two things this report does not provide: a nationwide count of how many rural communities currently lack drinking water or wastewater service ( and don't collect that data), and any total dollar figure for how much funding is currently available or appropriated across the 28 programs combined. Both would meaningfully sharpen the scale of this gap, and their absence is itself part of what 's coordination recommendation is meant to address.

's review excluded programs primarily serving tribal communities (the subject of separate, ongoing work as of this report) and excluded colonias -- unincorporated communities along the U.S.-Mexico border -- citing its own September 2024 report on that population, which found about 5% of colonias still lacked water infrastructure access and about 29% lacked wastewater access, per a 2015 nonprofit needs assessment. Both figures are cited here for context on the broader rural-access picture, not as part of the 28-program review itself. made three recommendations total: one urging and jointly to update their coordination memorandum, and two urging specifically to give its technical-assistance providers better guidance on local community capacity.

Sources(1) ▾
  • U.S. Government Accountability Office, Rural Water Infrastructure: Better Agency Coordination Could Help Unserved Communities Address Their Needs (2026-06-23) report to congressional requesters examining what and know about rural communities lacking drinking water/wastewater service, which of their programs can help, and the challenges those communities face accessing that assistance. Based on program document review, interviews with federal officials and officials from 10 selected states, and site visits to rural communities in three states and one Tribe. Fetched via WebFetch (returned as binary, auto-saved) and converted with pdftotext -layout; read in full. gao.gov · original document